Been away at work for the last few days.....
Get a little bit of rain here :boat: and the world is comming to it's end :shrug:
Onward....
Oh......
"EVIL ONE" :devil2: thank you thank you for your approval :bowdown::bowdown::bowdown: that's cool to be in the
'Hood..... Not forgetting you either there "SC" :thumbsup: thank you for your sponsership, OK...... Now what :shrug: :laugh:
I went for another ride yesturday, the engine is loosing up a bit due to idle picking up .....I haven't did any jetting yet nor screwed around with the needle. But I will this weekend and get a video of it rolling down the interstate.....
Bonanza 2 - YouTube
After my ride , I went and re-adjusted everything.... Brake, Clutch, & Chains.... Last, but not least the side play in the J/S with some various thickness of shims....
The J/S bearings did develope some more side play, so I took out the 30 thou. shim and installed a 45 thou shim....
On the swing arm shaft I installed a 30 thou. shim on each side and got rid of the side slop in it. I also installed a 1/4 spacer between the shock and pipe/muffler mount. Once the pipe was tightened up, the mount was about 1/4" away from the shock, so a spacer was needed to make it right and not put the pipe in a bind once tightened up....
The last of the last for this build, will be the making of my "Bogus" gas cap.....
I have to go to work :mad2:
BC DAVE :thumbsup: